Webinar: G100 - Fulfilling the requirements with SMA

Where a Distribution Network Operator (DNO) has assessed that an increase in generation export capacity will require costly or time-bound up

Where a Distribution Network Operator (DNO) has assessed that an increase in generation export capacity will require costly or time-bound upstream reinforcement, installers may choose to restrict the net export from their connection rather than wait for or contribute to the reinforcement. EREC G100 sets out to provide guidance on the connection of the customer export limiting scheme that runs in parallel to the distribution systems of licenced Distribution Network Operators ( DNO )

Contents: • Basic requirements of a G100 compliant system• Which SMA solution to use for which system type and size• Example system Schematics for an Export limiting scheme• Cost effective compliance using SMA solutions• Commissioning SMA solutions to ensure compliance

Webinar

Webinar: G100 - Fulfilling the requirements with SMA

Date and time:


Add to Calendar

Price:

Free

« back